EPDM Installation Guides
Written, step-by-step instructions for every EPDM detail we supply. Click any guide below to open it. Each one can also be downloaded as a printable PDF to take up on the roof. If you would rather watch it done, the same details are covered on our installation video page, and the EPDM calculator will work out what you need for your roof.
01Laying EPDM Rubber Membrane
The membrane itself is the part of the job that matters most. Work through it steadily - a sheet that is laid clean, relaxed and properly bonded will keep a flat roof dry for decades.
Download printable PDF - Laying EPDM Rubber Membrane-
Step 1
Ensure deck is dry and clean.
-
Step 2
Position membrane on the roof and allow it to relax for 30-45 minutes: allow slightly longer in colder temperatures.
-
Step 3
Fold back one half of the rubber and apply an even coat of water-based adhesive to the deck, using a roller and sleeve. For best results, it is essential that the water based deck adhesive is thoroughly stirred with a paddle stirrer prior to use.
-
Step 4
Mate the rubber to the adhesive immediately, and use a soft broom to sweep out any air bubbles.
-
Step 5
Repeat the process for the other side.
-
Step 6
Thoroughly sweep roof.
02Installing Kerb Edge Trims
Kerb edge trims finish a raised roof edge. The membrane is carried up and over the kerb and held down beneath the trim.
Download printable PDF - Installing Kerb Edge Trims-
Step 1
Install a 2" x 1" batten to the roof perimeter, level with roof deck.
-
Step 2
Once the membrane is installed, push down on the edge trim.
-
Step 3
Fix in place using the supplied poly top nails.
-
Step 4
Trim any excess rubber with a sharp blade.
-
Step 5
Please allow 5mm gap between trims for expansion and contraction.
03Installing Gutter Edge Trims
Gutter edge trims hold down the leading edge of the membrane and throw water clear into the gutter, so it cannot track back under the rubber or down the fascia.
Download printable PDF - Installing Gutter Edge Trims-
Step 1
Install a 2" x 1" batten to the roof perimeter, level with roof deck.
-
Step 2
Install the base plate as shown, 5mm below the deck using the supplied stainless steel nails.
-
Step 3
Adhere membrane and dress over the base plate.
-
Step 4
Pull rubber taut and install top plate as shown, secured with the supplied poly top nails.
-
Step 5
Trim any excess rubber with a sharp blade.
-
Step 6
Please allow 5mm gap between trims for expansion and contraction.
04Installing Trim Corners
Fitting external corner pieces where kerb or gutter edge trims meet.
Download printable PDF - Installing Trim Corners-
Step 1
Kerb edge external corners come with 2 removable tabs (Gutter trims do not feature the removable tabs)
-
Step 2
Neatly abut trims.
-
Step 3
If Edge Trim meets Edge Trim then both tabs need to be removed carefully using a pair of pliers. If Edge Trim meets Gutter Trim then only one tab needs to be removed.
-
Step 4
We recommend fixing or gluing the corner on only one side to allow for expansion and contraction. This will lower the risk of the corner piece splitting.
05Wall Trim Flashing
Sealing the junction where the roof meets a wall. This is the longest detail on the list and the one worth taking most care over.
Download printable PDF - Wall Trim Flashing-
Step 1
Cut chase in the wall then thoroughly clean the wall, chase and rubber.
-
Step 2
Apply a thin coat of contact adhesive to the rubber and the wall.
-
Step 3
Once touch dry, starting at the bottom, carefully mate the surfaces together. Smooth by hand and silicone roller.
-
Step 4
Trim membrane.
-
Step 5
Position a piece of 9” flashing tape as shown and mark the perimeter, allowing an extra 1cm.
-
Step 6
Apply primer to the marked area using a scrubber pad and handle, allow primer to become touch dry.
-
Step 7
Peel back a section of backing paper and, starting from the top, slowly work downwards as shown.
-
Step 8
Apply a gentle heat source to the corner if needed.
-
Step 9
Thoroughly roller with Silicone and Penny Rollers.
-
Step 10
Insert wall trim into chase and secure at 600mm centres with the supplied fixings. Rawplugs are not needed if a 5.5mm masonry drill bit is used.
-
Step 11
Thoroughly seal chase with mastic.
06Under Tiles
Taking the membrane up and under an existing tiled roof above the flat.
Download printable PDF - Under Tiles-
Step 1
Carefully remove enough tiles and battens to be able to dress the rubber 400mm under the tiles
-
Step 2
Fold the felt underlay up and tuck under existing tiles.
-
Step 3
Apply a thin coat of contact adhesive to the rubber membrane and lay board.
-
Step 4
Allow both surfaces to become touch dry and, starting from the bottom, mate together, working the rubber into any angle changes.
-
Step 5
Reinstate the felt underlay and battens over the rubber.
-
Step 6
Reinstall the tiles.
07Onto Tiles / Slope Off
Where the flat roof discharges onto a tiled slope below, lead and cover tape carry the water across the join.
Download printable PDF - Onto Tiles / Slope Off-
Step 1
Allow 150mm overhang onto tiles.
-
Step 2
Dress lead into place 6” onto tiles, 3” onto the deck. We recommend using minimum 9” Code 4 lead cut into 1200mm lengths max.
-
Step 3
Fix into position using screws.
-
Step 4
Apply primer to lead and rubber approx. 160mm wide using scrubber pad and handle. Allow to go touch dry.
-
Step 5
Centralize the length of cover tape and carefully remove release paper applying downward pressure. Use silicone roller to seal.
08External Corner (Upstand Wall / Skylight)
Forming an external corner around an upstand wall or a skylight kerb using 9” flashing tape.
Download printable PDF - External Corner (Upstand Wall / Skylight)-
Step 1
Mark rubber as shown with crayon or similar. A should be 85mm and B should be 135mm
-
Step 2
Prime brickwork and rubber with quick scrubber and handle and allow to dry.
-
Step 3
Fold up bottom of 9" flashing by 6cm (C) and carefully remove rear section of release paper. Start from the top, centralise and adhere in place, ensuring that the folded up 6cm section will finish neatly at the bottom. Once in place the folded-up section will be self-supporting and will allow you to remove the rest of the release paper.
-
Step 4
Using fingers, gently dress the flashing tape down the wall towards the deck paying extra attention to ensure it is tight into the angle change. Still using fingers, gently stretch the flashing tape, 1cm at a time, onto the roof. This will form a neat semi-circle. A gentle heat source such as a hot air gun is useful in cold conditions.
-
Step 5
Use a silicone and penny roller to ensure is properly mated, paying attention to the angle change.
-
Step 6
If there are gaps at the top of the corner detail use additional 9” flashing tape and primer.
-
Step 7
Thoroughly roller.
09Internal Corner
Folding and bonding the membrane into an internal corner so it sits flat with no trapped air.
Download printable PDF - Internal Corner-
Step 1
Adhere one of the upstands and apply contact adhesive to the remaining rubber and upstand as shown. Draw a 45-degree line from the corner outwards.
-
Step 2
Once dry, mate the EPDM as shown, up to the line. Fold the remaining section of rubber to form a neat triangular flap that will neatly dress into the internal corner.
-
Step 3
Apply primer with a quick scrubber pad and handle, allow to dry.
-
Step 4
Mate the surfaces together and roller.
10Pipe Seal
Any soil pipe, flue, vent or conduit coming up through the roof is a hole that has to be sealed. A purpose-made EPDM pipe seal flexes with the pipe and stays watertight.
Download printable PDF - Pipe Seal-
Step 1
Place pipe seal over the top of the pipe and cut with a knife or scissors to ensure a snug fit.
-
Step 2
Stretch boot over the pipe until the flange touches the deck, mark the perimeter with a crayon or similar, allowing an additional 2cm.
-
Step 3
Fold the pipe boot up or remove and apply primer to the marked area using the scrubber pad and handle, allow to dry.
-
Step 4
Reposition pipe seal, locate the join in the release paper and slowly remove at a shallow angle smoothing as you go with your hand. Once the backing paper has been totally removed roller using silicone roller.
-
Step 5
Apply a small bead of silicone sealant to the top of the pipe seal and secure with jubilee clip.
11Seam / Join
Joining two sheets - either because the roof is wider than a single sheet, or to patch a repair. Done properly with seam tape the join is as strong as the membrane either side of it.
Download printable PDF - Seam / Join-
Step 1
Ensure rubber is straight and overlapping by 10cm, create a line 2cm away from the join using a crayon or similar. Position your thumb between the crayon and join as a good guide.
-
Step 2
Fold the rubber back and apply primer to both sides and up to the crayon line using quick scrubber pad and handle. Allow both surfaces to dry.
-
Step 3
Starting at one end, carefully apply 3” quick seam tape to the lower primed area, ensuring the brown paper is in line with the crayon line, once the full length has been applied roller using a silicone roller.
-
Step 4
Overlap the rubber onto the brown release paper and slowly remove the release paper at a shallow angle, smoothing in place with your hand as you go.
-
Step 5
Once removed, thoroughly roller.
12Rainwater Outlet
Bonding a vertical rainwater outlet through the deck and flashing over the top of it.
Download printable PDF - Rainwater Outlet-
Step 1
Place rainwater outlet through the pre-cut hole and mark around it using a crayon or similar.
-
Step 2
Apply primer the underside of the rainwater outlet and 1cm beyond the marked area on the rubber using a quick scrubber pad and handle. Allow both surfaces to dry.
-
Step 3
Mate the surfaces together and compress with silicone roller.
-
Step 4
Round the corners of the 12” flashing tape (Rainwater flashing kit) with scissors and neatly position over outlet. Mark the perimeter with crayon.
-
Step 5
Apply primer to the rubber and outlet using the scrubber pad and handle and extend primer beyond the crayon line by 2cm.
-
Step 6
Once touch dry, neatly position the 12" flashing tape and carefully remove the backing paper. Roller firmly in place and use a sharp blade to carefully cut out the hole.
13Horizontal Rainwater Outlet
A horizontal outlet takes the water out sideways through an upstand or parapet instead of down through the deck - used where a vertical outlet is not practical.
Download printable PDF - Horizontal Rainwater Outlet-
Step 1
Place the outlet through the wall and mark around it using a crayon or similar, allowing an additional 1cm around the perimeter.
-
Step 2
Apply primer to the underside of the outlet and the marked area on the rubber using a scrubber pad and handle. Allow both surfaces to dry.
-
Step 3
Mate the outlet to the rubber and seal in place using a penny and silicone roller.
-
Step 4
Round the corners of the 18" flashing tape (Horizontal flashing kit) with scissors and neatly position over outlet. Mark the perimeter with crayon.
-
Step 5
Apply primer to the rubber and outlet using the scrubber pad and handle and extend primer beyond the crayon line by 2cm and into the mouth of the outlet by 100mm.
-
Step 6
Once touch dry, working from the bottom, position the 18" flashing tape and carefully remove the backing paper. Ensure it is tightly sealed into the corners and use a penny and silicone roller. Carefully cut the sides and top at the aperture and allow flap to drop into the primed outlet.
Not sure which detail applies to your roof, or need a hand working out quantities? Call us on 028 9048 4278 or get in touch - we have been roofing for three generations and we would rather talk it through than have you guess.
